Client: | Nature Conservation Authority |
Location: | De Weerribben |
Period: | 2010-2012 |
Scope: | Dig 20 hectares of peat holes Remove 25 hectares of woods |
Contract form: | Uniform Administrative Conditions for Integrated Contracts (UAV-gc) |
Description: | Approx. 25 hectares of woods were removed and 20 hectares of peat holes were dug for a nature conservation authority (Life II Project). The material was pumped to the Wetering West disposal site with the aid of a 7 km pressure pipeline. |
Equipment: | Waterking WK 80, WK 220 and WK 250, wood shredder, booster station and shredder pontoon. |
De Weerribben National Park
22 May 2013 by